• español
    • português (Brasil)
    • English
Ver item 
  •   Página inicial
  • Editorial
  • Artículos de revistas
  • Redes
  • Vol. 26, no. 51
  • Ver item
  •   Página inicial
  • Editorial
  • Artículos de revistas
  • Redes
  • Vol. 26, no. 51
  • Ver item
  • português (Brasil) 
    • español
    • português (Brasil)
    • English
  • Entrar
JavaScript is disabled for your browser. Some features of this site may not work without it.

Capacidades de la ingeniería nacional y tomadores de decisiones: la construcción de la represa hidroeléctrica en Rincón del Bonete, Uruguay 1904-1945.

National engineering capabilities and decision-makers: the construction of the hydroelectric dam in Rincón del Bonete, Uruguay, 1904–1945.

Thumbnail
Visualizar/Abrir
(327.5Kb)
Data
2020-12
Autor
Waiter, Andrea
Metadata
Mostrar registro completo
Resumo
El presente estudio hace foco en la historia de la construcción de la primera represa de generación de energía hidroeléctrica uruguaya de abastecimiento público, Represa Rincón del Bonete, inaugurada en diciembre de 1945. El período de estudio comienza en 1904, año en que se realiza la primera propuesta para el aprovechamiento del Río Negro para la generación de energía eléctrica y culmina en 1945, año en que se pone en funcionamiento la primera turbina en la unidad 2 de la Represa. En el tiempo transcurrido entre ambos extremos existieron diferentes configuraciones político-institucionales que, entendemos, pueden dar cuenta de una demora de más de cuarenta años entre que se planteó la idea sobre el aprovechamiento del Río Negro para la hidroelectricidad y su materialización. Este trabajo pretende profundizar en cada una de dichas configuraciones desde una perspectiva sistémica donde los vínculos y relaciones entre ingenieros y gobierno cobran especial importancia. El proceso de construcción de la Represa es analizado bajo la lupa de las relaciones entre ciencia, tecnología e innovación (CTI) y su incorporación a la producción del Uruguay de la primera mitad del siglo xx.
 
This study focuses on the history of the construction of Uruguay's first public hydroelectric power generation dam, the Rincón del Bonete Dam, inaugurated in December 1945. The study period begins in 1904, the year in which the first proposal for harnessing the Río Negro for electricity generation was made, and ends in 1945, the year in which the first turbine in Unit 2 of the dam was put into operation. In the time between these two extremes, there were different political and institutional configurations that, we understand, can account for a delay of more than forty years between the idea of ​​harnessing the Río Negro for hydroelectricity and its materialization. This work aims to delve into each of these configurations from a systemic perspective where the links and relationships between engineers and government take on special importance. The Dam's construction process is analyzed through the lens of the relationship between science, technology, and innovation (STI) and its incorporation into Uruguay's production in the first half of the 20th century.
 
URI
http://ridaa.unq.edu.ar/handle/20.500.11807/5719
Colecciones
  • Vol. 26, no. 51
Estadisticas
http://ridaa.unq.edu.ar/handle/20.500.11807/5719/statistics

Universidad Nacional de Quilmes
Entre em contato | Deixe sua opinião | Estadísticas | Política del Sitio
 

 

Navegar

Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

Minha conta

EntrarCadastro

Estatística

Ver as estatísticas de uso

Universidad Nacional de Quilmes
Entre em contato | Deixe sua opinião | Estadísticas | Política del Sitio